1. The diagram drawn by Tianzheng HVAC must be opened with Tianzheng, and it cannot be led into t3, and then select the right pipeline and operate it correctly.
2. System bug. Tianzheng HVAC drawing is a powerful HVAC cad software. When using this software, its air duct drawing does not display the air duct, which is the cause of the system bug. You can exit the software and reopen it.
3. When the air duct is in the sky, its actual feasibility should be considered first. If it is feasible, the distance between the ends of the air ducts to be connected by the three-way or four-way can be adjusted appropriately in the drawing. Only when the distance is appropriate can the three-way or four-way be automatically generated.
4. If you use version 0, it can be generated directly. But you should use the 0 menu completely when drawing the plane. There is: "System" - "System Generation" in the Tianzheng menu. After clicking, all the system diagrams you drew with 0 will be automatically generated.
Find the right location, click the left button, and the system diagram will be successfully generated! Of course, the system diagram automatically generated by the computer still has certain defects, and the errors in it need to be corrected manually.
In the relevant window of Tianzheng Electric, directly find the system generation in the toolbar and click it. At this time, it is necessary to set the corresponding parameters according to the actual situation and select to confirm. If there is no problem in the next step, go back and forth through the specified floor plan. In this way, the effect of the diagram will be generated, and the system diagram can be drawn.
First of all, the Tianzheng water supply and drainage software will be opened.Open the target file that needs to generate the system diagram. Click System-System Generation on the left toolbar, and a dialog box will pop up. In the pop-up dialog box, select the pipeline type, modify the floor height and number of floors, and then click [Directly generate a single-layer system diagram].
Enter tmnload in the command line. If you want to select the file, select tch to load the Tianzheng initial menu, which is the toolbar on the left you mentioned.
1. It is mainly the problem of the block, which may not be decomposed. A plane refers to the entire connection of any two points on the surface falling on this surface. It is a two-dimensional zero-curvature extension. Such a surface is a straight line in which it intersects with any surface similar to it.
2. The reason for this problem is: the computer is infected with a CAD virus, and the problem can be solved after antivirus. As follows: First, find the virus file "acaddoc.lsp" on the computer, as shown in the figure below, and then enter the next step.
3. Use of graphic symbols: The electrical system diagram should use the specified graphic symbols to represent different types of components and equipment, such as switches, lamps, motors, etc. These symbols should be clear, easy to recognize and meet relevant standards. Line representation method: The electrical system diagram should clearly show the direction of the line, the connection method, etc.
4. The content of this article is analyzed from several aspects in the electrical construction drawing review, which mainly involves the drawing review of the power supply and distribution system, the power distribution problem of fire fighting equipment, the lightning protection grounding design problem, and the lighting design problem.The common disease of the high-voltage system diagram: whether the high-voltage primary wiring diagram is reasonable; whether the consent of the power supply bureau has been obtained. Is there a special measuring cabinet?
5. Method 1: It may be that CAD does not search for the Tianzheng path by default. Options command, manually add the Tianzheng path in the file bar, the following three paths (mine is V0, V0 is the same), apply, confirm, and then restart Tianzheng to try.
6. Whether the hydropower construction drawings are complete. Check the whole set of construction drawings, check the drawing catalog, and see if the construction drawings and the partial large sample drawings or general drawings indicated in the drawings are missing. The unification of hydropower construction drawings. Are the system drawings, floor plans, large sample drawings, general drawings and standard drawings of the reference atlas of hydropower construction unified?
1. Draw a floor plan 2 Equipment connection, position in the diagram 3 System generation (sxtt) 4 Select the floor plan to complete the operation.
2. In the first step, open the software, select the "Power System" option in the menu bar, as shown in the figure below, and then proceed to the next step. Secondly, after completing the above steps, you need to set the corresponding parameters according to the actual situation, as shown in the figure below, and then proceed to the next step.
3. Open the Tianzheng HVAC software and select "Drawing" in the menu bar. Select the "Water Tank" option in the "Drawing" menu bar. In the drawing interface, select the water tank component and drag it to the position where the expansion tank needs to be installed. Adjust the size and position of the water tank according to the actual situation.
4. If you must do it, there are several points to pay attention to: first of all, check whether the height is consistent, especially whether the height of the soft connector and equipment is consistent with the air duct; secondly, the disperser must be automatically generated when drawing; in addition, the waterproof shutter will be very inconsistent after generation, it will be deleted by yourself, which will not affect the effect of the system diagram. .
5. How to draw CAD hydropower diagrams? The drawing method and detailed operation steps are as follows: Step 1, open the software, select the "Power System" option in the menu bar, as shown in the figure below, and then proceed to the next step.
Click "Generate a single-layer system diagram" below the picture box, and it will let you choose the pipeline in the floor plan.Select all boxes, and it will automatically identify the type of pipeline you want to generate, and right-click to confirm.
First of all, the Tianzheng water supply and drainage software will be opened. Open the target file that needs to generate the system diagram. Click System-System Generation on the left toolbar, and a dialog box will pop up. In the pop-up dialog box, select the pipeline type, modify the floor height and number of floors, and then click [Directly generate a single-layer system diagram].
Electrical system diagrams are generally drawn by yourself, or generate one casually, and then supplement the data and loops by yourself. If you want to generate it by yourself, then each line needs to be marked and other data when drawing, and the generation is not as good as expected. It takes more time than drawing by yourself.
Set the floor height, then select the floor plan of the corresponding floor, and then click to generate a three-dimensional combination, and that's it.It should be noted that the coordinates of each floor plan should be consistent. If you need to see the three-dimensional of a floor plan, you can enter 3DO in the command bar, three-dimensional appear, and then select the required axis map.
Global trade intelligence whitepapers-APP, download it now, new users will receive a novice gift pack.
1. The diagram drawn by Tianzheng HVAC must be opened with Tianzheng, and it cannot be led into t3, and then select the right pipeline and operate it correctly.
2. System bug. Tianzheng HVAC drawing is a powerful HVAC cad software. When using this software, its air duct drawing does not display the air duct, which is the cause of the system bug. You can exit the software and reopen it.
3. When the air duct is in the sky, its actual feasibility should be considered first. If it is feasible, the distance between the ends of the air ducts to be connected by the three-way or four-way can be adjusted appropriately in the drawing. Only when the distance is appropriate can the three-way or four-way be automatically generated.
4. If you use version 0, it can be generated directly. But you should use the 0 menu completely when drawing the plane. There is: "System" - "System Generation" in the Tianzheng menu. After clicking, all the system diagrams you drew with 0 will be automatically generated.
Find the right location, click the left button, and the system diagram will be successfully generated! Of course, the system diagram automatically generated by the computer still has certain defects, and the errors in it need to be corrected manually.
In the relevant window of Tianzheng Electric, directly find the system generation in the toolbar and click it. At this time, it is necessary to set the corresponding parameters according to the actual situation and select to confirm. If there is no problem in the next step, go back and forth through the specified floor plan. In this way, the effect of the diagram will be generated, and the system diagram can be drawn.
First of all, the Tianzheng water supply and drainage software will be opened.Open the target file that needs to generate the system diagram. Click System-System Generation on the left toolbar, and a dialog box will pop up. In the pop-up dialog box, select the pipeline type, modify the floor height and number of floors, and then click [Directly generate a single-layer system diagram].
Enter tmnload in the command line. If you want to select the file, select tch to load the Tianzheng initial menu, which is the toolbar on the left you mentioned.
1. It is mainly the problem of the block, which may not be decomposed. A plane refers to the entire connection of any two points on the surface falling on this surface. It is a two-dimensional zero-curvature extension. Such a surface is a straight line in which it intersects with any surface similar to it.
2. The reason for this problem is: the computer is infected with a CAD virus, and the problem can be solved after antivirus. As follows: First, find the virus file "acaddoc.lsp" on the computer, as shown in the figure below, and then enter the next step.
3. Use of graphic symbols: The electrical system diagram should use the specified graphic symbols to represent different types of components and equipment, such as switches, lamps, motors, etc. These symbols should be clear, easy to recognize and meet relevant standards. Line representation method: The electrical system diagram should clearly show the direction of the line, the connection method, etc.
4. The content of this article is analyzed from several aspects in the electrical construction drawing review, which mainly involves the drawing review of the power supply and distribution system, the power distribution problem of fire fighting equipment, the lightning protection grounding design problem, and the lighting design problem.The common disease of the high-voltage system diagram: whether the high-voltage primary wiring diagram is reasonable; whether the consent of the power supply bureau has been obtained. Is there a special measuring cabinet?
5. Method 1: It may be that CAD does not search for the Tianzheng path by default. Options command, manually add the Tianzheng path in the file bar, the following three paths (mine is V0, V0 is the same), apply, confirm, and then restart Tianzheng to try.
6. Whether the hydropower construction drawings are complete. Check the whole set of construction drawings, check the drawing catalog, and see if the construction drawings and the partial large sample drawings or general drawings indicated in the drawings are missing. The unification of hydropower construction drawings. Are the system drawings, floor plans, large sample drawings, general drawings and standard drawings of the reference atlas of hydropower construction unified?
1. Draw a floor plan 2 Equipment connection, position in the diagram 3 System generation (sxtt) 4 Select the floor plan to complete the operation.
2. In the first step, open the software, select the "Power System" option in the menu bar, as shown in the figure below, and then proceed to the next step. Secondly, after completing the above steps, you need to set the corresponding parameters according to the actual situation, as shown in the figure below, and then proceed to the next step.
3. Open the Tianzheng HVAC software and select "Drawing" in the menu bar. Select the "Water Tank" option in the "Drawing" menu bar. In the drawing interface, select the water tank component and drag it to the position where the expansion tank needs to be installed. Adjust the size and position of the water tank according to the actual situation.
4. If you must do it, there are several points to pay attention to: first of all, check whether the height is consistent, especially whether the height of the soft connector and equipment is consistent with the air duct; secondly, the disperser must be automatically generated when drawing; in addition, the waterproof shutter will be very inconsistent after generation, it will be deleted by yourself, which will not affect the effect of the system diagram. .
5. How to draw CAD hydropower diagrams? The drawing method and detailed operation steps are as follows: Step 1, open the software, select the "Power System" option in the menu bar, as shown in the figure below, and then proceed to the next step.
Click "Generate a single-layer system diagram" below the picture box, and it will let you choose the pipeline in the floor plan.Select all boxes, and it will automatically identify the type of pipeline you want to generate, and right-click to confirm.
First of all, the Tianzheng water supply and drainage software will be opened. Open the target file that needs to generate the system diagram. Click System-System Generation on the left toolbar, and a dialog box will pop up. In the pop-up dialog box, select the pipeline type, modify the floor height and number of floors, and then click [Directly generate a single-layer system diagram].
Electrical system diagrams are generally drawn by yourself, or generate one casually, and then supplement the data and loops by yourself. If you want to generate it by yourself, then each line needs to be marked and other data when drawing, and the generation is not as good as expected. It takes more time than drawing by yourself.
Set the floor height, then select the floor plan of the corresponding floor, and then click to generate a three-dimensional combination, and that's it.It should be noted that the coordinates of each floor plan should be consistent. If you need to see the three-dimensional of a floor plan, you can enter 3DO in the command bar, three-dimensional appear, and then select the required axis map.
Trade data-driven logistics planning
author: 2024-12-24 02:48Trade intelligence for aerospace industry
author: 2024-12-24 02:46How to understand INCOTERMS with data
author: 2024-12-24 02:15International shipment tracking APIs
author: 2024-12-24 02:05How to identify top export opportunities
author: 2024-12-24 00:48Predictive supplier scoring algorithms
author: 2024-12-24 03:20Trade data-driven logistics planning
author: 2024-12-24 03:20How to build a resilient supply chain
author: 2024-12-24 02:37Logistics optimization by HS code
author: 2024-12-24 01:49HS code-driven cross-border e-commerce
author: 2024-12-24 01:37333.92MB
Check853.73MB
Check259.83MB
Check514.95MB
Check793.33MB
Check468.26MB
Check931.66MB
Check359.56MB
Check394.45MB
Check229.69MB
Check572.86MB
Check554.16MB
Check913.22MB
Check916.54MB
Check872.68MB
Check265.57MB
Check625.59MB
Check236.61MB
Check956.41MB
Check251.83MB
Check185.47MB
Check491.78MB
Check546.23MB
Check388.63MB
Check316.32MB
Check763.84MB
Check895.41MB
Check846.71MB
Check438.56MB
Check793.28MB
Check998.52MB
Check297.85MB
Check238.52MB
Check528.82MB
Check972.39MB
Check487.87MB
CheckScan to install
Global trade intelligence whitepapers to discover more
Netizen comments More
2624 China HS code interpretation guide
2024-12-24 03:25 recommend
2400 How to reduce compliance-related delays
2024-12-24 03:04 recommend
1825 Global trade data enrichment services
2024-12-24 01:25 recommend
2669 Global import export freight indexes
2024-12-24 01:04 recommend
2716 Automotive supply chain HS code checks
2024-12-24 00:46 recommend