Mainly include the following types. Voltage stabilizer online monitoring system: monitor the working status of the voltage stabilizer in real time by monitoring the input voltage, output voltage, load current and other parameters of the voltage stabilizer.
Power monitoring system, through the intelligent power monitoring terminal to the power supply transformer in the building, high-voltage side power supply parameters and low-voltage side power supply parameters are monitored, data recording and analysis are carried out, and refined management, dynamic control and alarm functions are realized.
Power transmission supervision: monitor and manage the operation of power transmission and transmission grid, including the operation status of power transmission equipment, power load scheduling, power transmission loss, etc. Power distribution supervision: supervise the operation of power distribution and power distribution network, including the monitoring and management of the status of power distribution equipment, power supply reliability, power distribution loss and other aspects.
Energy management system: Energy management system is a comprehensive energy consumption management system, which can integrate a variety of energy consumption monitoring equipment, including electricity, water, gas, etc., to provide comprehensive energy data and analysis reports to help enterprises realize energy classification management and improve energy utilization efficiency.
The differences between these two monitoring systems are as follows: the purpose of monitoring is different: the video surveillance system, which can be seen everywhere, is mainly used for security monitoring in public places, commercial places and other places to prevent and combat crime; while the monitoring system of substations is mainly used for power system operation. Security monitoring to ensure the stable operation of the power system.
Video display part The core of the video display part is TV, monitor and other equipment, which is the part that can best reflect the height of the whole monitoring system. If the display part is beautifully done, the whole project will add a lot of color.
The structure is clear and simple: the monitoring host through the network video setThe monitoring system management software realizes various functions of video matrix, picture splitter and other equipment in the analog system, and realizes the video recording function through the computer hard disk, so that the system structure is simplified and highly integrated.
Transmission: The transmission distance is relatively close, and the video transmission method of coaxial cable transmission of video baseband signal can be adopted. Long-distance transmission or transmission that needs to avoid strong electromagnetic field interference should adopt optical cable transmission. When there are special requirements, it is appropriate to use metal-free optical cables.
The perimeter camera and the circumnavigation camera are two different camera systems, which differ in function and installation position. First of all, the perimeter camera system is an on-board camera system composed of four cameras, front, rear, left and right, which are installed in the front, rear, left and right directions of the vehicle.
The production conditions of the operation site of the power monitoring system and the safety facilities should meet the requirements of relevant standards and specifications.
The power cord must be made of copper core Class II protection wire with an insulation level of more than 500v, and climate-resistant power cords need to be used outdoors.
The basic conditions for operators of the power safety work protocol (line part) are: after being identified by a doctor, there are no symptoms that hinder work (physique examination at least once every two years). Two. Have the necessary knowledge of production safety, learn the emergency rescue method, and especially learn electric shock first aid.
1. Soft signals are soft signals, while hard contact signals are hard contact signals. Soft signal refers to protection, measurement and control and other devices. Through twisted pair, network cable, optical fiber and other media, the protection action, device abnormality, remote measurement and other signals are sent to the monitoring system.
2. The hard contact is the contact point given on the strong electric control box contactor and its backpack. Usually, the passive dry contact point on the backpack is the operating and fault signal DI point, and the control line connected to the DO point on the contactor coil or intermediate relay coil. The commonly used soft contact is to measure pulses or to integrate the system commercially through a certain protocol.
3. PST is the abbreviation of Power System Stabilizer, which translates as power system stabilizer.It is a device used to improve the stability of the power system. PST improves the stability of the power system by detecting parameters such as frequency and voltage fluctuations of the power system, and by injecting control signals into the disturbance signal.
4. After receiving the interval layer measurement and control protection device sent to the circuit breaker or knife gate corresponding division, closure and locking commands under the GOOSE network, the intelligent operation box will be converted into the corresponding pulse signal drive relay hard contact to complete the corresponding remote operation.
5. GOOSE adopts network signals to replace the communication method of hard wiring between conventional substation devices, which greatly simplifies the secondary cable wiring of substations.
6. The polarity connection method of the welding machine takes the workpiece as a reference, that is, the welding workpiece is connected to the positive pole output by the welding machine, and the welding handle (pliers) connects to the negative pole.The positive polar connection arc has hard characteristics. The arc is narrow and steep, the heat is concentrated, and the penetration is strong. With a relatively small current, a deeper melting depth can be obtained to form a welding path.
HS code application in re-export scenarios-APP, download it now, new users will receive a novice gift pack.
Mainly include the following types. Voltage stabilizer online monitoring system: monitor the working status of the voltage stabilizer in real time by monitoring the input voltage, output voltage, load current and other parameters of the voltage stabilizer.
Power monitoring system, through the intelligent power monitoring terminal to the power supply transformer in the building, high-voltage side power supply parameters and low-voltage side power supply parameters are monitored, data recording and analysis are carried out, and refined management, dynamic control and alarm functions are realized.
Power transmission supervision: monitor and manage the operation of power transmission and transmission grid, including the operation status of power transmission equipment, power load scheduling, power transmission loss, etc. Power distribution supervision: supervise the operation of power distribution and power distribution network, including the monitoring and management of the status of power distribution equipment, power supply reliability, power distribution loss and other aspects.
Energy management system: Energy management system is a comprehensive energy consumption management system, which can integrate a variety of energy consumption monitoring equipment, including electricity, water, gas, etc., to provide comprehensive energy data and analysis reports to help enterprises realize energy classification management and improve energy utilization efficiency.
The differences between these two monitoring systems are as follows: the purpose of monitoring is different: the video surveillance system, which can be seen everywhere, is mainly used for security monitoring in public places, commercial places and other places to prevent and combat crime; while the monitoring system of substations is mainly used for power system operation. Security monitoring to ensure the stable operation of the power system.
Video display part The core of the video display part is TV, monitor and other equipment, which is the part that can best reflect the height of the whole monitoring system. If the display part is beautifully done, the whole project will add a lot of color.
The structure is clear and simple: the monitoring host through the network video setThe monitoring system management software realizes various functions of video matrix, picture splitter and other equipment in the analog system, and realizes the video recording function through the computer hard disk, so that the system structure is simplified and highly integrated.
Transmission: The transmission distance is relatively close, and the video transmission method of coaxial cable transmission of video baseband signal can be adopted. Long-distance transmission or transmission that needs to avoid strong electromagnetic field interference should adopt optical cable transmission. When there are special requirements, it is appropriate to use metal-free optical cables.
The perimeter camera and the circumnavigation camera are two different camera systems, which differ in function and installation position. First of all, the perimeter camera system is an on-board camera system composed of four cameras, front, rear, left and right, which are installed in the front, rear, left and right directions of the vehicle.
The production conditions of the operation site of the power monitoring system and the safety facilities should meet the requirements of relevant standards and specifications.
The power cord must be made of copper core Class II protection wire with an insulation level of more than 500v, and climate-resistant power cords need to be used outdoors.
The basic conditions for operators of the power safety work protocol (line part) are: after being identified by a doctor, there are no symptoms that hinder work (physique examination at least once every two years). Two. Have the necessary knowledge of production safety, learn the emergency rescue method, and especially learn electric shock first aid.
1. Soft signals are soft signals, while hard contact signals are hard contact signals. Soft signal refers to protection, measurement and control and other devices. Through twisted pair, network cable, optical fiber and other media, the protection action, device abnormality, remote measurement and other signals are sent to the monitoring system.
2. The hard contact is the contact point given on the strong electric control box contactor and its backpack. Usually, the passive dry contact point on the backpack is the operating and fault signal DI point, and the control line connected to the DO point on the contactor coil or intermediate relay coil. The commonly used soft contact is to measure pulses or to integrate the system commercially through a certain protocol.
3. PST is the abbreviation of Power System Stabilizer, which translates as power system stabilizer.It is a device used to improve the stability of the power system. PST improves the stability of the power system by detecting parameters such as frequency and voltage fluctuations of the power system, and by injecting control signals into the disturbance signal.
4. After receiving the interval layer measurement and control protection device sent to the circuit breaker or knife gate corresponding division, closure and locking commands under the GOOSE network, the intelligent operation box will be converted into the corresponding pulse signal drive relay hard contact to complete the corresponding remote operation.
5. GOOSE adopts network signals to replace the communication method of hard wiring between conventional substation devices, which greatly simplifies the secondary cable wiring of substations.
6. The polarity connection method of the welding machine takes the workpiece as a reference, that is, the welding workpiece is connected to the positive pole output by the welding machine, and the welding handle (pliers) connects to the negative pole.The positive polar connection arc has hard characteristics. The arc is narrow and steep, the heat is concentrated, and the penetration is strong. With a relatively small current, a deeper melting depth can be obtained to form a welding path.
End-to-end shipment tracking solutions
author: 2024-12-23 23:02HS code-driven customs risk scoring
author: 2024-12-23 22:13HS code-based competitor benchmarking
author: 2024-12-23 21:52HS code-facilitated PL selection
author: 2024-12-23 21:21Cross-border HS code harmonization
author: 2024-12-23 21:02HS code adaptation for local regulations
author: 2024-12-23 23:18Organic produce HS code verification
author: 2024-12-23 23:03HS code-driven risk mitigation
author: 2024-12-23 22:49Comprehensive supplier audit data
author: 2024-12-23 22:19Global trade data harmonization
author: 2024-12-23 22:06691.79MB
Check861.52MB
Check353.26MB
Check851.44MB
Check844.44MB
Check529.27MB
Check827.71MB
Check619.71MB
Check262.56MB
Check552.27MB
Check593.63MB
Check412.97MB
Check768.95MB
Check682.54MB
Check981.38MB
Check881.32MB
Check312.98MB
Check995.38MB
Check368.51MB
Check739.57MB
Check779.97MB
Check883.94MB
Check949.44MB
Check423.29MB
Check975.83MB
Check489.86MB
Check299.93MB
Check346.85MB
Check738.47MB
Check851.73MB
Check442.81MB
Check652.79MB
Check478.39MB
Check478.83MB
Check489.77MB
Check268.56MB
CheckScan to install
HS code application in re-export scenarios to discover more
Netizen comments More
1717 How to simplify multi-leg shipments
2024-12-23 23:38 recommend
1189 Real-time customs inspection logs
2024-12-23 23:16 recommend
1157 Global trade claim management
2024-12-23 23:09 recommend
409 WTO trade compliance resources
2024-12-23 23:06 recommend
165 Ceramic tiles HS code classification
2024-12-23 22:39 recommend