1. Disassembly and steps of automobile engine disassembly of engine body components 1) Remove the fixing screw of the cylinder head, and pay attention to the screws should be from both ends Cross and loosen in the middle, and remove the screw in 3 times.2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. Disassembly steps: To remove the external components of the aircraft, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
4. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil span, and loosen the engine oil span.
1. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. The disassembly and installation method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times;Lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil sup, and release the engine oil sup.
4. The engine disassembly steps are carried out in the order of machine, assembly, parts, assembly and parts. Pay attention to proofreading the assembly mark when disassembling to ensure that it can be reassembled as it is. When disassembling various threaded connectors, it should be disassembled in a professional symmetrical order to ensure the complete disassembly of the threaded connectors.
5. Remove the front mask and baffle of the engine. First, loosen the six nuts fixing the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
6. Remove it in the gearbox bodyDismount assembly: First remove the clutch cover and the flywheel connection bolt, and then move the detacher up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
Fix the bolt under the shock absorber after removing it. Remove the two M10×55 engine suspension bracket bolts, pull the engine back together with the rear wheel and remove it. Remove the ignition coil from the engine suspension bracket, remove the engine mounting bolt M10×185 nut, remove the engine suspension assembly, and remove the engine assembly.
First, remove the battery ground wire, drain the coolant, remove the mask and baffle, remove the pipelines such as oil pipes, and remove the flywheel cover.Put it back in the opposite direction. The specific steps are as follows: remove the battery ground wire to avoid accidental damage to the electrical equipment. Adjust the empty switch to the "warm air" position to ensure that the coolant can be completely discharged.
Turn the crankshaft to put the engine's 4-cylinder piston at the lower stop. Remove the fastening nuts of the connecting rod of the 4-cylinder respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassemble the engine crankshaft flywheel group, loosen the flywheel to fasten the screw, disassemble the flywheel, the flywheel is relatively heavy, pay attention to safety when disassembly.Remove the front and rear sealing flanges and oil seals of the crankshaft.
The process of removing from the engine rack: (1) Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cords and wires on the generator.Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
First, remove the fuel supply system, ignition system, cooling system and other system-related parts from the engine, so as to disassemble the cylinder block crankcase group. Remove the cylinder head cover, remove the camshaft, etc. to facilitate the removal of the cylinder head.
The engine disassembly process of mechanical assembly is roughly as follows: place the engine upright, remove the inlet and exhaust manifolds and the cylinder head outlet pipes. Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump;Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
*global goods transport-APP, download it now, new users will receive a novice gift pack.
1. Disassembly and steps of automobile engine disassembly of engine body components 1) Remove the fixing screw of the cylinder head, and pay attention to the screws should be from both ends Cross and loosen in the middle, and remove the screw in 3 times.2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. Disassembly steps: To remove the external components of the aircraft, first remove the external parts as required, and remove the motor, generator and other components. Then remove the intake and exhaust manifold, remove the cylinder cover, and then remove the gasoline pumps on both sides, so that the external components of the engine are basically dismantled.
4. The disassembly method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times; lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil span, and loosen the engine oil span.
1. Remove the fixing screw of the cylinder head. Note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. 2) Lift the cylinder head. Remove the cylinder pad and pay attention to the installation direction of the cylinder pad. Loosen the oil release screw of the oil span shell to release the oil in the oil span shell.
2. Place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
3. The disassembly and installation method of the engine includes the following steps: remove the fixing screw of the cylinder head, loosen it from both ends to the middle, and remove it three times;Lift the cylinder head, remove the cylinder pad, release the oil release screw of the engine oil sup, and release the engine oil sup.
4. The engine disassembly steps are carried out in the order of machine, assembly, parts, assembly and parts. Pay attention to proofreading the assembly mark when disassembling to ensure that it can be reassembled as it is. When disassembling various threaded connectors, it should be disassembled in a professional symmetrical order to ensure the complete disassembly of the threaded connectors.
5. Remove the front mask and baffle of the engine. First, loosen the six nuts fixing the front mask cover and the two fixing bolts on the left and right of the radiator, and remove the front bumper, as shown in Figure 3. Loosen the four hexagonal fixing nuts in front of the front mask and remove the front mask. Loosen the two screws fixing the condenser on the longitudinal beam.
6. Remove it in the gearbox bodyDismount assembly: First remove the clutch cover and the flywheel connection bolt, and then move the detacher up and down from the flywheel. III) Disassembly and installation of the engine 1) Remove the 13 fixing screw of the cylinder head, note that the screw should be rotated from both ends to the middle, and remove the screw in 3 times. 2) Lift the cylinder head.
Fix the bolt under the shock absorber after removing it. Remove the two M10×55 engine suspension bracket bolts, pull the engine back together with the rear wheel and remove it. Remove the ignition coil from the engine suspension bracket, remove the engine mounting bolt M10×185 nut, remove the engine suspension assembly, and remove the engine assembly.
First, remove the battery ground wire, drain the coolant, remove the mask and baffle, remove the pipelines such as oil pipes, and remove the flywheel cover.Put it back in the opposite direction. The specific steps are as follows: remove the battery ground wire to avoid accidental damage to the electrical equipment. Adjust the empty switch to the "warm air" position to ensure that the coolant can be completely discharged.
Turn the crankshaft to put the engine's 4-cylinder piston at the lower stop. Remove the fastening nuts of the connecting rod of the 4-cylinder respectively, remove the connecting rod bearing cover, pay attention to the connecting rod pairing mark, and put it in order.
Engine disassembly steps: place the engine upright and remove the intake and exhaust manifolds and cylinder head outlet pipes. Remove the cylinder head cover, remove the rocker arm shaft assembly on the front and rear cylinder head; remove the crankshaft ventilation pipe, and remove the boom chamber cover; remove the putter.
Disassemble the engine crankshaft flywheel group, loosen the flywheel to fasten the screw, disassemble the flywheel, the flywheel is relatively heavy, pay attention to safety when disassembly.Remove the front and rear sealing flanges and oil seals of the crankshaft.
The process of removing from the engine rack: (1) Empty the water and oil in the tank, turn off the car fuel tank switch, and remove the oil pump pipe connector. ( 2) Remove the power cords and wires on the generator.Remove the inlet pipes of the water tank and the nuts everywhere. Connect bolts and pins, etc. Remove the water tank and frame. ( 3) Remove the hood and fender.
First, remove the fuel supply system, ignition system, cooling system and other system-related parts from the engine, so as to disassemble the cylinder block crankcase group. Remove the cylinder head cover, remove the camshaft, etc. to facilitate the removal of the cylinder head.
The engine disassembly process of mechanical assembly is roughly as follows: place the engine upright, remove the inlet and exhaust manifolds and the cylinder head outlet pipes. Remove the fixing screw of the cylinder head, note that the screw should be crossed and loosened from both ends to the middle, and the screw should be removed three times. Lift the cylinder head, remove the cylinder cushion, and pay attention to the installation direction of the cylinder cushion.
The process of removing from the engine rack: drain the water and oil in the tank, turn off the switch of the car fuel tank, and remove the oil pipe connector of the oil pump;Remove the power cord and the wire on the generator. Remove the inlet pipe of the water tank and the nuts everywhere. Connect bolts and pins, etc.
*Trade data for transshipment analysis
author: 2024-12-24 02:55CIS countries HS code usage patterns
author: 2024-12-24 02:27Trade data for industrial raw materials
author: 2024-12-24 00:46Medical consumables HS code data
author: 2024-12-24 00:14Frozen goods HS code classification
author: 2024-12-24 00:10Tire imports HS code classification
author: 2024-12-24 02:48Sourcing intelligence platforms
author: 2024-12-24 02:42HS code-based data mining for analytics
author: 2024-12-24 01:31Electronics supply chain intelligence
author: 2024-12-24 00:36849.61MB
Check235.71MB
Check692.79MB
Check837.88MB
Check478.16MB
Check547.11MB
Check246.18MB
Check858.79MB
Check697.36MB
Check572.91MB
Check685.66MB
Check333.67MB
Check795.35MB
Check857.61MB
Check254.39MB
Check437.38MB
Check256.84MB
Check721.71MB
Check188.93MB
Check536.14MB
Check358.76MB
Check529.73MB
Check143.21MB
Check557.95MB
Check513.37MB
Check696.81MB
Check294.61MB
Check194.65MB
Check135.51MB
Check461.51MB
Check181.62MB
Check129.37MB
Check322.74MB
Check678.21MB
Check991.59MB
Check174.89MB
CheckScan to install
global goods transport to discover more
Netizen comments More
232 Predictive trade data cleaning
2024-12-24 02:45 recommend
819 Global trade event monitoring
2024-12-24 02:10 recommend
699 HS code compliance for customs
2024-12-24 01:57 recommend
1723 HS code-based commodity chain analysis
2024-12-24 01:16 recommend
1209 Country of import HS code variations
2024-12-24 01:05 recommend